r&m-logo ISO-certified-company    

About Us   I   Services   I   Products   I   Projects   I   Enquiry   I   Contact Us

 
 

BIAL Airport - Trumpet Bridge, Bangaluru

Synopsis::   Enhancement of Bridge Spans

trumpet bridge, bangaluru
Action Taken::
The bridge is constructed & designed for 2 different routes i.e Airport to Bangaluru & Airport to Devanahali. At 2 different Spans, Due to inappropriate Grade of Concrete the bridge span has come up with number of cracks which becomes an unavoidable circumstance.
To maintain the life & durability of the running bridge we have undergone for the strengthening of Bridge Spans by utilizing the “External Pre-stressing Technology” which is a specially designed technique for Enhancing the Flexural Strength of the Structures.


Site Application::
images

      © R & M International 2009, an ISO 9001:2008 company
powered by 7th Sense