IT Park - Chennai
Synopsis: Strengthen the 25m x 50m long sagged slab
Action Taken:Due to early removing of shuttering the 25m x 50m long slab got 100m sagged which becomes inadequate for the structure to bear the designed load. With the help of Pre-stress system the slab was up-lifted back by stretching the CFK Laminates at a pre-stress pressure of 10 tons and anchored on both ends with High tensioned anchor plates.
Site Application:




Projects
- Amba Bhavani Temple, Dombivali
- Reliance Navi Mumbai Special Economic Zone(NMSEZ), Uran
- Full Rehabilitation of ROB at JNPT, Navi Mumbai
- Hindustan Petroleum Corporation Ltd. HPCL, Mumbai
- Hindustan Construction Company (HCC) Campus, Vikhroli
- SP Infocity, Chennai
- Mumbai Airport Runway Bridge Strengthening
- Dept. Of Oceanography, IIT Madras
- Flyover,National Highway 7, Bangalore
- ESIC HospitalBangalore
- One Indiabulls Centre, Worli, Mumbai
- Gulraj HotelMahape, Navi Mumbai
- Platina Wadhva Complex BKC, Mumbai
- Emerald Jewel Industry, Coimbatore
- Hotel Airlink Project Santacruz, Mumbai
- Aristo (Inderjeet Infrastructure), Mumbai
- ECCI IT Park, Chennai
- Syndicate Bank QuartersGhatkopar, Mumbai
- Deloitte Project of Larsen & Toubro Ltd Hyderabad
- Five Star Hotel, Chennai
- Classic City Pune
- ESIC-Lower Parel, Mumbai
- Indian Institute of Technology Madras
- Jawaharlal Nehru Port Trust, Navi Mumbai