project-banner

ESIC Hospital, Bangalore

esic-hospital

Synopsis: The 50 year old building needed strengthening

Action Taken:

The 50 years old masonry structure was strengthened by pre-stressing method.

Site Application:

Drilling Work

Drilling Work

fixing of Clamping Device

fixing of Clamping Device

Cylinder Fixing & Checking Alignments

Cylinder Fixing & Checking Alignments

Appling of Hydraulic Pressure

Appling of Hydraulic Pressure

Beam after Pre-stressing

Beam after Pre-stressing